MEG Tests Notice

Union County no longer accepts MEG tests and/or reports from a NC Registered Design Professional in lieu of an Electrical Inspection for wiring that has been concealed.  Any concealment of electrical wiring prior to an approved inspection must be removed. (Effective July 1, 2025)

 

Fee Schedule

Current Fee Schedule - through July 31, 2026

Adopted Fee Schedule - effective August 1, 2026


Building Code Enforcement strives to complete all inspections in a timely manner, typically the day requested. However, there are times when the number of requests is more than can be completed in a single day. These requests are carried forward and will be completed as soon as possible.

If an occupied residence is scheduled for an inspection, please note a number on the inspection request that the inspector should call prior to arriving. This will prevent a homeowner from waiting at the residence for the inspector to arrive.

Your patience in this matter is greatly appreciated.

How do I obtain a Building Permit?
Zoning
Building Codes and Procedures – Union County Resources