Skip to content

SP105 Crooked Creek WRF Electrical Systems Improvements

IFB 2021-027R

SP105 Crooked Creek WRF Electrical Systems Improvements

Date Issued: 12/16/20

Date Due: 01/28/21


This project includes the following: replace the following electrical equipment in the Sludge Transfer Pump Station Building: (a) Main Switchboard (b) Distribution Switchboard (c) Motor Control Center (d) Power Panel (e) Step Down Transformer (f) Lighting replacement; modify the Sludge Transfer Pump Station building to separate the electrical room occupied space from the process/pumping room occupied space; replace the standby diesel generator and automatic transfer switch (WRF CC-ATS) at the Sludge Transfer Pump Station building; replace the following electrical equipment in Control Building 901: (a) Motor Control Center (b) Lighting Panel (c) Step Down Transformer (three separate transformers) (d) Lighting Panel Disconnect Switch (e) Dryer Panel; and decommission/disconnect electrical equipment in the existing lime storage/mixer building.