Date Issued: 01/27/21
Date Due: 03/04/21
The project consists of constructing the following major items: (1) Furnish and install approximately 24,300 LF of 36’’ ductile iron water transmission pipeline (2) Furnish and install approximately 3,200 LF of 16’’ ductile iron water transmission pipeline (3) Furnish and install all associated fittings, valves, air-release valve structures, blow-offs, tie-ins, interconnections, services, clearing, erosion control, cleaning, disinfection and testing, pipeline abandonment and all other pipeline work shown on the Drawings and described in the Specifications.